Biodiversity Net Gain by Collington Winter logo
Biodiversity Net Gain Plan Devon – Biodiversity Net Gain plan by chartered ecologists

Biodiversity Net Gain Plan · Devon

Biodiversity Net Gain Plan Devon: BNG Plans for Planning Conditions

Biodiversity Net Gain plan in Devon

Across Devon, developers and landowners with planning permission must obtain formal approval of a statutory Biodiversity Net Gain plan (BNG plan) before starting work on site. Whether you are building housing in Exeter, Plymouth, Torbay, Barnstaple, Tiverton, Honiton or Newton Abbot, progressing commercial parks along the M5 and A38, or redeveloping rural holiday lets and farmsteads, your BNG plan must prove a minimum 10 percent measurable increase in biodiversity units maintained for at least 30 years.

Collington Winter Environmental prepares statutory Biodiversity Gain Plans across every Devon planning authority, including Exeter, East Devon, Mid Devon, North Devon, South Hams, Teignbridge, Torridge, West Devon, Plymouth and Torbay (plus Dartmoor and Exmoor National Park fringes). Led by chartered ecologist Olivia Collington CEnv, our team works nationwide with a 2-week standard turnaround and an urgent instruction service for tight deadlines. Explore our BNG consultants in Devon page or contact us for a free initial discussion.

Devon planning authorities and local BNG scrutiny

Devon's planning system spans eight district councils, two unitary authorities (Plymouth and Torbay), two National Park authorities and Devon County Council. All enforce Schedule 7A of the Town and Country Planning Act 1990 alongside local plan biodiversity policies and the Devon Local Nature Recovery Strategy (LNRS).

Ecological officers across Devon (including Plymouth's established BNG team and district ecological advisors) scrutinise pre-commencement Biodiversity Gain Plans closely. They check that Devon banks and native hedgerows are mapped accurately, that strategic significance reflects the Devon LNRS, that South Hams or Exe Estuary Habitats Regulations mitigation is kept separate from statutory BNG, and that 30-year management plans are realistic and properly funded.

Key Devon habitats affecting BNG plan calculations

Devon's rich rural and coastal ecology creates several distinctive factors in pre-commencement BNG plans:

  • Devon hedge banks: Traditional earth banks faced with stone or turf and topped with native woody species are a defining feature of Devon's countryside. Recorded under the hedgerow module of the Statutory Biodiversity Metric, removing even short stretches for site access creates a hedgerow unit shortfall that cannot be traded against area habitat gains.
  • Culm grassland, orchards and woodland: Across North Devon, Torridge, Mid Devon and West Devon, wet rush pasture, Culm grassland, traditional orchards and ancient woodland carry high or very high distinctiveness and strict trading or irreplaceable-habitat protections.
  • River catchments and estuaries: Sites near the River Exe, River Teign, River Dart, River Tamar, River Taw or River Torridge trigger the separate watercourse module where riparian zones are affected, often requiring an accredited River Condition Assessment.
  • Protected species and coastal zones: Around the South Hams SAC (greater horseshoe bats), Dawlish Warren and the Exe Estuary, Habitats Regulations mitigation must be clearly distinguished from statutory Biodiversity Net Gain calculations.

What our Devon Biodiversity Net Gain plan includes

Every Biodiversity Net Gain plan we produce for Devon councils is built around the official DEFRA statutory template and local ecological review criteria:

  1. Completed statutory Biodiversity Gain Plan form aligned with your exact Devon planning permission reference and pre-commencement condition.
  2. Final locked Statutory Biodiversity Metric (or Small Sites Metric) spreadsheet reconciled accurately against your approved architectural layout and landscape general arrangement drawings.
  3. Baseline BNG survey records, UKHab habitat maps, condition assessment sheets and aerial-imagery checks back to 30 January 2020.
  4. Clear mitigation hierarchy explanation demonstrating how Devon bank retention, tree protection and on-site enhancement were prioritised first.
  5. A 30-year Habitat Management and Monitoring Plan (HMMP) specifying realistic establishment works, meadow cutting, hedge-bank trimming, orchard care, monitoring years and named management responsibility.
  6. Off-site biodiversity unit allocation proof from registered Devon habitat banks or statutory biodiversity credit receipts where on-site delivery cannot meet the full 10 percent target.

On-site design versus off-site BNG units in Devon

Retaining Devon hedge banks, designing access points through existing field gateways, enhancing perimeter buffers into species-rich neutral meadow and planting native orchard or woodland belts often allows rural and edge-of-town Devon sites to hit 10 percent net gain on site. Where tight urban sites in Exeter, Plymouth or Torbay leave a deficit, sourcing registered off-site units from a Devon habitat bank within the same council area or National Character Area avoids spatial risk penalties.

30-year legal security and avoiding discharge delays

Significant on-site habitat creation or enhancement in Devon must be legally secured for 30 years through a Section 106 agreement, conservation covenant or planning condition. Before lodging your Biodiversity Gain Plan for the council's 8-week determination period, our ecologists audit every habitat parcel, hedgerow length and tree count against your final drawings so your pre-commencement condition discharges cleanly on the first review.

Step-by-step condition discharge in Devon

Discharging a pre-commencement Biodiversity Gain Plan across Devon's district councils, Plymouth City Council or Torbay Council is most predictable when the technical steps are completed in sequence:

  • Step 1: Review your planning permission wording, approved landscape drawings and any Habitats Regulations conditions to verify that baseline UKHab survey data remains up to date.
  • Step 2: Reconcile every square metre of proposed buildings, access roads, retained Devon hedge banks, native orchard or meadow buffers and drainage basins in the final Statutory Biodiversity Metric spreadsheet.
  • Step 3: If an on-site unit deficit remains, reserve registered off-site biodiversity units from a Devon habitat bank so the Biodiversity Gain Site Register allocation reference can be included in your submission.
  • Step 4: Submit the completed statutory DEFRA Biodiversity Gain Plan form, locked metric spreadsheet, GIS maps and 30-year HMMP via the Planning Portal, factoring the 8-week determination period into your build schedule.

We also work directly alongside your architect, planning agent and landscape designer before submission so any minor drawing revisions are reflected accurately in the final metric without delaying your start-on-site timetable.

Book your Devon Biodiversity Net Gain plan

Collington Winter Environmental prepares clear, planning-ready Biodiversity Net Gain plans across all Devon authorities within our standard 2-week turnaround, with an urgent instruction service available when construction start dates are pressing. Call 01204 939 608 or visit our contact page.

Frequently asked questions

+Do all Devon councils require a Biodiversity Net Gain plan before work starts?

Yes. All eight Devon district councils, Plymouth City Council, Torbay Council and the National Park authorities enforce the mandatory pre-commencement Biodiversity Gain Plan condition on non-exempt planning permissions.

+How are Devon hedge banks scored in a Biodiversity Net Gain plan?

Devon hedge banks are recorded in the hedgerow module of the Statutory Biodiversity Metric. Because hedgerow units are separate from area habitat units, any loss of hedge bank must be compensated with hedgerow creation, enhancement or off-site hedgerow units.

+Can Exe Estuary or South Hams SAC mitigation count as my Devon BNG plan?

No. Mitigation required under the Habitats Regulations for European protected sites cannot simply be double-counted to replace your mandatory 10 percent BNG duty. We separate protected-site mitigation and BNG clearly in your submission.

+How long do Devon councils take to approve a Biodiversity Gain Plan?

The statutory determination period is 8 weeks from validation. Submitting a fully audited metric reconciled to your approved landscape drawings and a complete 30-year HMMP minimises follow-up queries.

+Can a small housing site in Devon use the Small Sites Metric?

Eligible minor developments (such as 1 to 9 dwellings on a site under 1 hectare) can use the Small Sites Metric provided no priority habitats, European protected species or statutory watercourses are present on site.

+Where can I purchase off-site biodiversity units in Devon?

Registered off-site units are available from private Devon habitat banks and council-backed schemes on the national Biodiversity Gain Site Register. Sourcing units within your own district or National Character Area avoids spatial risk penalties.

+How quickly can Collington Winter prepare a Devon BNG plan?

Our standard turnaround is 2 weeks from completion of any required site survey and receipt of finalised drawings, with an urgent instruction service available for tight deadlines.

Related reading

Need a Biodiversity Net Gain assessment?

Speak to our ecologists today for clear, planning-ready advice.