Hedgerow Units and Watercourse Units in BNG – Biodiversity Net Gain

Biodiversity Net Gain Guide

Hedgerow Units and Watercourse Units in BNG

OC

By Olivia Collington, Managing Director, CEnv

5 min read

Three types of biodiversity unit

The statutory biodiversity metric does not produce a single score. It measures biodiversity in three separate modules:

  • Area habitat units for habitats such as grassland, woodland, scrub, ponds and built land
  • Hedgerow units for hedgerows and lines of trees
  • Watercourse units for rivers, streams, canals, ditches and culverts

Each module must show at least a 10% gain on its own. This catches many developers out. A scheme can deliver an impressive gain in area habitat units and still fail biodiversity net gain because it removes a hedgerow or culverts a ditch. Hedgerow units and watercourse units are often called linear units because they are measured by length rather than area.

The trading rules

You cannot trade one type of unit for another. Area habitat units cannot make up for lost hedgerow units, and hedgerow units cannot make up for lost watercourse units. On top of that, within each module there are trading rules based on distinctiveness. Losing a high distinctiveness hedgerow, such as a species rich hedgerow with trees, generally needs to be replaced with hedgerow of the same or higher distinctiveness.

In practice that means that if your development removes 100 metres of native hedgerow, you will need to create or enhance enough hedgerow to replace those units plus 10%, either on site or by buying off-site hedgerow units from a registered biodiversity gain site.

How hedgerow units are calculated

Hedgerow units are based on the length of each hedgerow, its type and its condition. The metric distinguishes between different hedgerow types, for example native hedgerows, species rich native hedgerows, hedgerows with trees and lines of trees. Condition is assessed against criteria including height, width, gaps, the presence of a margin and the health of the hedge base.

Common ways to generate hedgerow units on site include:

  • planting new native species rich hedgerows along boundaries and through open space
  • gapping up and laying existing hedgerows to improve their condition
  • allowing hedgerows to grow taller and wider and adding hedgerow trees
  • adding uncut margins at the base of hedges

Hedgerows are one of the easier linear habitats to deliver on development sites, but they need space. A hedge squeezed between a close boarded fence and a footpath will rarely reach good condition.

How watercourse units are calculated

Watercourse units cover rivers, streams, ditches, canals and culverted sections. They are calculated using length, watercourse type and condition, and also take into account encroachment, which is development within the riparian zone alongside the watercourse. Condition for rivers and streams is normally assessed using a river condition assessment, a structured survey method based on the Modular River Survey (MoRPh) approach. This must be carried out by a surveyor trained in the method.

Developments that affect watercourses typically lose units by culverting, realigning channels, adding outfalls with hard headwalls or building close to the bank. Gains can be achieved by:

  • removing culverts and reopening watercourses
  • creating wider buffer zones and planting the banks with native vegetation
  • removing hard bank protection and restoring natural features
  • improving ditch management, for example rotational clearance rather than full annual dredging

Watercourse units are often the hardest to buy off site, because fewer habitat banks offer them. Reducing impacts on site through design is therefore particularly valuable.

Why linear units cause late surprises

We often see linear units become a problem late in the design process. The landscape plan may be signed off, the area habitat gain looks comfortable, and then the metric reveals a shortfall in hedgerow or watercourse units. Typical causes include new site accesses cutting through boundary hedges, visibility splays requiring hedge removal and ditches being piped to make way for roads.

The fix is to run all three modules of the metric from the earliest layout stage. Baseline surveys should record every hedgerow and watercourse, including dry ditches and field drains that may count as watercourses, so the design team knows what is at stake.

Buying off-site hedgerow and watercourse units

If on-site delivery is not possible, you can buy hedgerow or watercourse units from a registered biodiversity gain site, just as with area habitat units. Supply is more limited, so it pays to start looking early. If no units are available, statutory biodiversity credits for hedgerows and watercourses can be bought as a last resort, at a significant cost.

How Collington Winter can help

Our ecologists carry out baseline habitat surveys, hedgerow condition assessments and river condition assessments, and run all three modules of the statutory biodiversity metric. We work with designers to protect the linear features that matter most and find practical ways to deliver gains on site. Read more about biodiversity metric calculations and BNG units, or contact us to discuss your site.

Frequently asked questions

+What are hedgerow units in BNG?

Hedgerow units measure the biodiversity value of hedgerows and lines of trees in the statutory biodiversity metric. They are calculated from length, hedgerow type and condition.

+What are watercourse units?

Watercourse units measure the biodiversity value of rivers, streams, ditches, canals and culverts. They are based on length, type, condition and encroachment into the riparian zone.

+Do hedgerow and watercourse units each need a 10% gain?

Yes. Area habitat, hedgerow and watercourse units are separate modules and each must show at least a 10% gain.

+Can area habitat units make up for lost hedgerows?

No. Units cannot be traded between modules. Lost hedgerow units must be replaced with hedgerow units.

+What is a river condition assessment?

It is a structured survey used to assess the condition of rivers and streams for the biodiversity metric, based on the Modular River Survey method. It must be done by a trained surveyor.

+Do ditches count as watercourses in the metric?

Yes. Ditches are included in the watercourse module, so removing or culverting them can create a requirement for watercourse units.

+Can I buy hedgerow units off site?

Yes. Hedgerow and watercourse units can be bought from registered biodiversity gain sites, although supply is more limited than area habitat units.

+How can we avoid a linear unit shortfall?

Survey all hedgerows and watercourses early, run all three metric modules from the first layout, and design accesses and roads to avoid removing linear features where possible.

OC

About the author

Olivia Collington

Olivia is Managing Director of Collington Winter Environmental and a Chartered Environmentalist with the Institute of Environmental Sciences. She holds Natural England bat, great crested newt and badger mitigation licences and specialises in Biodiversity Net Gain assessments using the statutory metric.

View profile

Related reading

Need a Biodiversity Net Gain assessment?

Speak to our ecologists today for clear, planning-ready advice.