Is Biodiversity Net Gain Mandatory? What Developers Need to Know

OC

By Olivia Collington, Managing Director, CEnv

12 November 2026 · 10 min read

Is Biodiversity Net Gain mandatory in England?

Yes: Biodiversity Net Gain is mandatory for most development within the English statutory planning framework, subject to exemptions and transitional arrangements. The minimum required gain is 10%, measured through the statutory biodiversity metric. Mandatory BNG commenced for major development on 12 February 2024 and for small development on 2 April 2024. Those dates concern the relevant application and transitional rules, not simply the day construction begins.

At Collington Winter Environmental, we start by checking the permission route, application history, development description and ecological baseline. This avoids two common mistakes: assuming that every project needs exactly the same BNG documents, and assuming that a small or previously developed site is automatically exempt.

Key takeaways for developers

  • Most in-scope planning permissions carry a statutory general biodiversity gain condition.
  • The biodiversity gain plan must be approved before development begins.
  • Small development is not the same thing as exempt development.
  • Exemptions have specific legal tests and should be evidenced.
  • Mandatory BNG is additional to protected-species and designated-site requirements.
  • Local policy and other planning obligations can remain relevant even where the statutory condition does not apply.

Where does the obligation come from?

The Environment Act 2021 introduced the BNG framework into the Town and Country Planning Act 1990 through Schedule 7A. For a planning permission within scope, the general biodiversity gain condition requires approval of a biodiversity gain plan before commencement. The statutory biodiversity gain objective compares pre-development biodiversity value with the compliant post-development position, including eligible off-site allocations or statutory credits where applicable.

The minimum is a 10% increase, not a requirement to landscape 10% of the application site. It is also not satisfied simply by replacing every removed tree. The biodiversity metric assesses habitats and applies distinctiveness, condition, strategic significance and relevant risk factors. Our guide to biodiversity metric calculations explains why the target depends on the baseline rather than on a standard planting allowance.

Local plans may contain additional biodiversity policies, including locally justified expectations above the national minimum. Their application needs to be considered in the relevant planning context. A developer should distinguish the statutory minimum from additional policy requirements rather than assuming the two are interchangeable.

Application dates and transitional arrangements

For major development, the mandatory regime generally applies to relevant applications made on or after 12 February 2024. For small development, the corresponding commencement date is 2 April 2024. Permissions linked to applications before those dates may fall outside the mandatory framework under transitional provisions.

Section 73 applications require particular care. A variation of an earlier permission does not automatically bring an otherwise transitional permission into mandatory BNG, and special provisions govern how the original permission is treated. Conversely, a fresh application should not be assumed to inherit the position of an older permission simply because it concerns the same land.

Outline permissions, reserved matters and phased schemes also need their application history checked. For phased development, the framework includes overall and phase biodiversity gain plan requirements. The correct answer depends on the legal route and facts, not just the label used on a project programme. Nationally significant infrastructure has a separate regime and timetable; the dates above should not be applied to it indiscriminately.

Which developments can be exempt?

The following explains the principal exemptions in the framework introduced in 2024. Exemption rules and commencement provisions should always be checked against the legislation and guidance applicable when the application is made, particularly where policy changes are proposed or introduced.

Householder applications

Householder applications are exempt from the mandatory general biodiversity gain condition. These commonly include qualifying domestic extensions and similar works within the defined householder application category. The exemption is tied to the legal application type, not merely to a project taking place near a house. A separate new dwelling is not automatically a householder proposal.

Qualifying self-build and custom-build development

The self-build and custom-build exemption has cumulative limits. Under the 2024 framework, development must comprise no more than nine dwellings, occupy a site no larger than 0.5 hectares, and consist exclusively of dwellings meeting the legal self-build or custom-build definition. A small speculative housing scheme is not exempt merely because purchasers might choose finishes.

The application should explain how the criteria are met and provide the evidence required by the authority. Ownership, procurement and delivery arrangements can matter. A scheme should not rely on an informal description of itself as self-build without considering the statutory definition.

The de minimis exemption

Under the 2024 exemption rules, development must not affect priority habitat and must affect less than 25 square metres of on-site area habitat with biodiversity value greater than zero, and less than five metres of relevant on-site linear habitat. The thresholds are strictly less than, not “up to and including”. Where both types are present, assess both limits rather than treating them as alternative allowances.

The relevant measure is habitat impact, not simply the building footprint. Access works, drainage, excavation and other construction effects can matter. A small red-line site is not automatically de minimis, while a proposal largely affecting sealed surfaces may need a different analysis. Accurate habitat mapping is a better starting point than assumptions based on site appearance.

Biodiversity gain sites and other routes

Development undertaken solely or mainly to fulfil the BNG condition for another development can fall within the biodiversity gain site exemption. This supports habitat delivery; it does not create a blanket exemption for any development on land described as a habitat bank. Qualifying high-speed railway development also has a specific exemption in the original framework.

Permitted development and retrospective permissions under section 73A have distinct treatment and should be checked separately. Exemption lists should not replace review of the actual permission route. Our plain-English BNG guide provides the broader ecological context for these legal distinctions.

What evidence belongs with the planning application?

If BNG applies, the application normally needs information identifying the pre-development biodiversity value, the relevant date and habitat evidence, alongside information about irreplaceable habitats and any applicable degradation history. The exact validation requirements should be checked with the planning authority. A clear draft delivery strategy helps demonstrate that the layout can achieve a compliant result.

If exemption is claimed, explain which exemption applies and why. Useful evidence may include a habitat plan, impact measurements, photographs or self-build supporting information, depending on the claim. An unsupported exemption statement can create avoidable validation or determination delays.

The biodiversity gain plan is normally approved after planning permission but before commencement. That does not make BNG an issue that can safely be postponed until after the design is fixed. A site unable to meet trading rules or accommodate credible habitats may need substantial redesign.

Off-site units, credits and starting work

Where on-site measures cannot deliver the required result, eligible off-site gains can contribute, subject to the biodiversity gain hierarchy. These must be appropriately secured, registered on Natural England's Biodiversity Gain Sites Register and allocated to the development. A reservation agreement alone is not the same as a completed allocation supporting an approved gain plan.

Government statutory biodiversity credits are the last resort, not the same product as privately sold biodiversity units. Their use must follow the relevant rules and evidence requirements. Before commencement, developers should check that the gain plan has actually been approved and that other pre-commencement conditions are also satisfied. Our guide to how to achieve biodiversity net gain connects these legal milestones to the practical project programme.

Exemption does not mean no ecology obligations

Protected species, designated sites, trees, hedgerows and local planning policy may still require surveys, mitigation or consent. A householder extension affecting a bat roost illustrates the distinction: exemption from statutory BNG would not disapply species protection. Likewise, a numerical net gain cannot justify harm that is unacceptable under another part of the planning or legal framework.

We therefore assess mandatory status separately from the broader ecological scope. Recording both decisions clearly helps applicants understand which documents are necessary, which requirements arise from law or policy, and which assumptions need to be revisited if the development changes.

Legal security, management and evidence

Biodiversity gains need more than a planting schedule. Significant on-site habitat enhancements and registered off-site gains must be secured for a minimum of 30 years. For off-site gains, the period runs from completion of the habitat enhancement works. Delivery arrangements should identify the land, the management obligations, the responsible parties, the monitoring programme and the remedies if habitat targets are missed. A section 106 planning obligation or conservation covenant can secure off-site delivery. Conservation covenants are agreements with designated responsible bodies; they are not simply private promises between a seller and buyer.

A Habitat Management and Monitoring Plan, often called an HMMP, translates the ecological proposal into practical tasks. It should describe the starting condition, intended habitat, establishment work, annual management, monitoring methods and measurable milestones. It should also explain how management will change if monitoring shows that the habitat is not developing as expected. Funding, access rights and responsibility after a land sale deserve attention before the documents are signed.

Registration is not the same as ecological approval

Natural England operates the Biodiversity Gain Sites Register for off-site gains. Registration and allocation link secured habitat gains to a development, helping prevent the same units being allocated twice. Register entry does not replace the developer's responsibility to demonstrate compliance, the local planning authority's approval of the biodiversity gain plan, or the land manager's duty to deliver the habitat. Ordinary on-site gains are not registered through this off-site register.

Read the metric alongside wider environmental duties

BNG does not replace protected-species legislation, designated-site protection, environmental assessment or other planning requirements. A scheme can show a numerical uplift and still be unacceptable because it damages an important ecological feature or fails another legal test. Irreplaceable habitats, such as ancient woodland, have special arrangements: losses are not compensated through ordinary metric trading, and bespoke compensation does not make an otherwise unacceptable loss acceptable.

Local Nature Recovery Strategies provide important spatial context. Where applicable, their mapped priorities inform strategic significance in accordance with metric guidance. They can also help identify better-connected habitat projects, but do not automatically make any planting scheme suitable. We consider ecological function, practical management and planning evidence together rather than treating the spreadsheet as the whole assessment.

Talk to our ecologists

Call 01204 939 608 or send us a message using the form on this page for an initial discussion about your site.

Frequently asked questions

+What does the 10% requirement measure?

The statutory target compares biodiversity value before development with the compliant post-development position. It is measured in habitat units using the applicable metric, not as a percentage of the land landscaped or the number of trees planted. Separate area habitat, hedgerow and watercourse accounts must be considered where relevant, and habitat trading rules must also be satisfied. A favourable headline percentage does not establish compliance on its own.

+When did mandatory BNG begin in England?

Mandatory BNG commenced for major development on 12 February 2024 and for small development on 2 April 2024, subject to exemptions and transitional arrangements. The relevant application history and permission route matter, so the construction start date alone does not determine whether the requirement applies. Older permissions and later variations need individual review. These dates should not be applied indiscriminately to separate infrastructure consent regimes.

+Can off-site biodiversity units replace all on-site measures?

Off-site units can help meet a shortfall, but they do not remove the need to follow the biodiversity gain hierarchy or address other ecological requirements. The units must be appropriate for the habitat losses, adjusted for the applicable spatial risk multiplier, legally secured, registered and allocated to the development. Retained on-site habitats still need protection. Buying units does not justify harm that is unacceptable under another planning or legal test.

+How long must biodiversity gains be maintained?

Significant on-site habitat enhancements and registered off-site gains require appropriate arrangements for at least 30 years. For off-site gains, this period runs from completion of the habitat enhancement works. Legal documents and management plans should identify responsibilities, monitoring, funding and corrective action. The commitment should be considered before any land transaction, because management obligations can affect future owners, occupiers and the flexibility to change land use.

+What is the difference between units and statutory credits?

Biodiversity units normally describe habitat value calculated through the metric, including privately supplied off-site gains. Statutory biodiversity credits are a government last-resort mechanism available under the mandatory framework, subject to the relevant requirements. They are not simply another name for habitat bank units. Developers should establish their on-site position and suitable off-site options before relying on credits, and should follow the applicable purchasing and evidence requirements.

+Does BNG replace protected-species surveys?

No. BNG is primarily a habitat-based assessment and does not replace protected-species legislation, designated-site protection or other environmental requirements. Species surveys may still be needed to inform planning, licensing and mitigation, even where a development is exempt from mandatory BNG. A proposal that achieves a numerical habitat uplift can still require redesign or further evidence because of its effects on bats, nesting birds, important habitats or protected sites.

+What does a Habitat Management and Monitoring Plan contain?

An HMMP describes the baseline, target habitats, establishment works, ongoing management and monitoring needed to deliver the proposed gains. It should identify responsible parties, measurable milestones and the response if habitats are not developing as intended. Practical details such as access, grazing or mowing arrangements, invasive-species control and funding are important. The plan should agree with the metric, habitat drawings and legal obligations rather than operating as a separate generic document.

+Are all self-build homes exempt from mandatory BNG?

No. Under the exemption framework introduced in 2024, the proposal must comprise no more than nine dwellings, occupy no more than 0.5 hectares and consist exclusively of qualifying self-build or custom-build dwellings. The legal definition matters, not simply the name given to the project. Evidence should support the claim, and the rules applicable at the application date should be checked. Other ecological obligations can still apply.

OC

About the author

Olivia Collington

Olivia is Managing Director of Collington Winter Environmental and a Chartered Environmentalist with the Institute of Environmental Sciences. She holds Natural England bat, great crested newt and badger mitigation licences and specialises in Biodiversity Net Gain assessments using the statutory metric.