
- Biodiversity units reported
- 53+
- Management and monitoring plan
- 30 years
The project
Collington Winter Environmental supported a habitat banking scheme on upland farmland in Pendle, Lancashire. Upland acid grassland formed the main habitat, with baseline parcels assessed as being in moderate to poor ecological condition. Scattered trees and watercourses were also present and retained as important parts of the wider habitat network.
The project centred on improving existing habitat rather than replacing the agricultural landscape with an unrelated design. Assessment using the statutory biodiversity metric informed an enhancement strategy suited to the land’s characteristics and continuing agricultural use.
A practical grassland enhancement strategy
The main intervention was to improve the condition of upland acid grassland through changes to grazing. Low-density cattle and sheep grazing formed part of the approach, with seasonal reductions or removal of livestock giving flowering plants time to develop and set seed.
Targeted rush management supported improvements in sward structure and the balance of plant species. Together, these measures created a practical route to habitat enhancement that could work within a farming environment. The management strategy was based on the site’s baseline condition rather than a generic planting scheme.
Protecting the existing habitat network
Existing trees and watercourses were retained and protected. Riparian buffers helped maintain connections between habitats and supported biodiversity beyond the grassland parcels themselves.
This combination of grassland management and protection of established features shows how a habitat bank can build on the ecological resources already present. The project’s focus was not simply the number of units, but an integrated approach to improving habitat condition across the landholding.
Long-term management and monitoring
The published case study describes enhancements secured through a 30-year habitat management and monitoring plan. This sets a framework for condition-led monitoring and adaptive management, allowing management actions to respond to progress towards the intended biodiversity outcomes.
The main website reports more than 53 biodiversity units through upland acid grassland enhancement. This is the reported project figure, not a statement about units currently available to purchase.
What the project illustrates
For landowners, the scheme demonstrates the potential to develop an additional income opportunity while retaining land ownership and allowing compatible farming to continue. It also highlights the importance of a clear long-term management framework and advice grounded in the statutory biodiversity metric.
Read more about habitat banking, BNG in Lancashire and habitat management and monitoring plans. To discuss the suitability of your own land, contact Collington Winter.
Adapted from Collington Winter’s original case study. Project figures are reproduced from the published account.
About the author
Olivia Collington
Olivia is Managing Director of Collington Winter Environmental and a Chartered Environmentalist with the Institute of Environmental Sciences. She holds Natural England bat, great crested newt and badger mitigation licences and specialises in Biodiversity Net Gain assessments using the statutory metric.
View profile